The enabling phase requires the participation of the system
administrator, database manager, and operations personnel. During
this phase
the required interfaces are tested and data is entered into the
system. The workstations and scanners are brought on-line and
documents are scanned and indexed. At the conclusion of this
stage the storage platform is enabled and the system administrator
tests the backup utilities.
On to the Verification Phase... |